KREMMLING AIRPORT RUNWAY WILL BE CLOSED FROM MONDAY AUGUST 3, 2020 THROUGH FRIDAY SEPTEMBER 18, 2020.
As part of the the airport asphalt maintenance schedule, the runway will be undergoing a 2 inch mill and overlay of the asphalt runway surface including turnarounds at both ends of the runway. Included in the project will be upgrades to all lighting fixtures around the runway including runway edge lights, PAPI's, REILs, and lighted signs.